Essential Phases of Bathroom Renovation
Ensuring your bathroom stays leak-free for 10+ years requires disciplined multi-trade execution:
- Phase 1: Demolition & Piping Inspection — Strip old tiles, check PPR copper connections, and replace concealed valves.
- Phase 2: Tanking Waterproofing — Apply polyurethane membrane 30cm up walls and 200cm inside shower zones.
- Phase 3: 24-Hour Flood Testing — Plug drains, fill floor with 5cm of water, and verify zero seepage on lower floor.
- Phase 4: Tile Laying & Epoxy Grouting — Dual-trowel porcelain tiles and seal joints with anti-mold epoxy.